Challenge
This project is a benchmark project for automation transformation of a company, involving three-dimensional warehouses, assembly lines, production lines, AGV (AMR) systems, WMS systems and MES systems. It is a comprehensive integration project. Stander provides AGV (AMR) systems and multi-system and business logic docking services. The original production was all done manually, with a relatively low degree of automation. This project is a new project planned in the new plant.
Solution
Stander cooperated with the customer and four other partners to conduct multiple discussions and formed a 253-page blueprint. It quickly customized the design of a fork-lifting AMR based on the Oasis chassis based on customer needs to meet the needs of narrow channels. The FMS scheduling system algorithm and scheduling strategy were customized and upgraded, and a large number of multi-system interfaces were secondary developed to efficiently meet customer needs. The automated material distribution and loading and unloading system includes:
Hardware: 14 Oasis600ULs, 11 single-layer double-station conveyor platforms (with integrated automatic actuators), 3 fork-lift mechanisms (with integrated automatic actuators), and 14 automatic charging piles;
Software:RoboVerse